Public Facilities
Emory Parking Structure
Reno, Nevada
Status: Completed March 08, 2019
Lyon Living tasked Neeser Construction with the Design&Build of this 324 stall parking structure in advance of the Residential Wrap (Emory) which would surround it. The concept was to start the parking structure early so there would be less interference with the residential. The design did include the future expansion of one floor which has not been used as of this date.
Project Details
Elizabeth Lenz Elementary School
Reno, Nevada
Status: Completed October 10, 2019
Replacement of the existing 23 classroom unit ventilators (UV), classroom sinks and cabinets, installing a new air cooled chiller, new chilled water plant housed in a new concrete block structure, all necessary chilled water piping and extension of the existing hydronic heating water piping to the new UV's and existing air handlers, new dedicated domestic water heater
Project Details
George Whittell High School Stadium
Minden, Nevada
Status: Completed September 21, 2018
The stadium project includes improvements, removal and replacement of bleachers, installation of all-weather track and press box/concession stand and bathroom building.
Project Details
Marvin Picollo School
Reno, Nevada
Status: Completed October 15, 2018
Replace two (2) boilers and system pumps with two (2) boilers, two (2) boiler pumps and two (2) system pumps (with VFDs). A new roof-mounted exhaust fan will be added. New lighting and painting for the Boiler Room. An emergency eye wash with tempering valve and associated cold and hot water piping will be added. Scope of Work forClassroom Wing HVAC: Remove six (6) fan
Project Details
Ely State Prison
Ely, Nevada
Status: Completed November 19, 2015
Remove and replace flooring in the infirmary and culinary areas of the prison.
Project Details
Reno Sparks Indian Colony
Reno, Nevada
Status: Completed December 04, 2014
This project involved re-modeling 4 separate buildings in a phased process which included extensive demolition, structural steel to completely change the support system for the roof structure, with interior buildout cresting numerous office, restroom, kitchen solar energy system, new plumbing, HVAC and flooring, ceramic tile, glass and glazing, ADA compliance, new roofing.
Project Details
JOT Travis Lower Level Remodel
Reno, Nevada
Status: Completed May 09, 2012
We completed a remodel of approximately 13,000 sq ft of classroom space in 71 calendar days. The project consisted of extensive demolition; build out of 2 new restrooms, HVAC, electrical and the construction walls to create 8 new classrooms. This was particularly challenging due to limited access and working hours and very tight schedule of 71 calendar days.
Project Details