Schools
Elizabeth Lenz Elementary School
Reno, Nevada
Status: Completed October 10, 2019
Replacement of the existing 23 classroom unit ventilators (UV), classroom sinks and cabinets, installing a new air cooled chiller, new chilled water plant housed in a new concrete block structure, all necessary chilled water piping and extension of the existing hydronic heating water piping to the new UV's and existing air handlers, new dedicated domestic water heater
Project Details
George Whittell High School Stadium
Minden, Nevada
Status: Completed September 21, 2018
The stadium project includes improvements, removal and replacement of bleachers, installation of all-weather track and press box/concession stand and bathroom building.
Project Details
Marvin Picollo School
Reno, Nevada
Status: Completed October 15, 2018
Replace two (2) boilers and system pumps with two (2) boilers, two (2) boiler pumps and two (2) system pumps (with VFDs). A new roof-mounted exhaust fan will be added. New lighting and painting for the Boiler Room. An emergency eye wash with tempering valve and associated cold and hot water piping will be added. Scope of Work forClassroom Wing HVAC: Remove six (6) fan
Project Details
Gomes Elementary Mechanical Upgrade
Reno, Nevada
Status: Completed September 13, 2017
Scope of work is to demo and replace with new finishes after installation of new mechanical equipment.
Project Details
North Valley Signature Academy
Reno, Nevada
Status: Completed November 11, 2016
This project consisted of a remodel of existing space that housed the wood and metal industrial arts shops. We demolished the interior and installed new dust collectors, and installed all kinds of new tools including chop saws, lathes, routers, power saws, drill press. We revised the compressed air system, installed a large overhead crane requiring new footings
Project Details
JOT Travis Lower Level Remodel
Reno, Nevada
Status: Completed May 09, 2012
We completed a remodel of approximately 13,000 sq ft of classroom space in 71 calendar days. The project consisted of extensive demolition; build out of 2 new restrooms, HVAC, electrical and the construction walls to create 8 new classrooms. This was particularly challenging due to limited access and working hours and very tight schedule of 71 calendar days.
Project Details