Reno Element Hotel by Marriott
Reno, Nevada
Status: Completed October 11, 2022
The project scope is a new mixed-use ground up Marriott Element Hotel consisting of 170 guestrooms total in 5 stories. The Marriott Element Hotel consists of a meeting room, motion center, dinning/breakfast area, full service kitchen, laundry, rooftop pool, spa with deck and a 1 story adjacent 6,404 SF restaurant.
Project Details
Emory @ R.E.D.
Reno, Nevada
Status: Completed October 15, 2021
The project as designed was 232 residential units with ground floor commercial and the usual amenities. The structure was five story type 3, wood construction with spread footings. Neeser Construction bid the project and was the low bidder. However, the bid was higher than the required budget required by the owner to make it financially feasible.
Project Details
The Deco
Sparks, Nevada
Status: Completed October 09, 2019
Unique reuse of existing parking structure, by designing and structurally improving an existing cast-in-place parking structure by expanding existing footings and grade beams and adding a podium deck at 51’ above ground level to support 6 stories (230 units) of light gauge steel framed residential apartments.
Project Details
Sierra Biofuels Plant
McCarran, Nevada
Status: Completed August 08, 2019
Design and build of Water Treatment tank pads and sumps
Project Details
Emory Parking Structure
Reno, Nevada
Status: Completed March 08, 2019
Lyon Living tasked Neeser Construction with the Design&Build of this 324 stall parking structure in advance of the Residential Wrap (Emory) which would surround it. The concept was to start the parking structure early so there would be less interference with the residential. The design did include the future expansion of one floor which has not been used as of this date.
Project Details
Elizabeth Lenz Elementary School
Reno, Nevada
Status: Completed October 10, 2019
Replacement of the existing 23 classroom unit ventilators (UV), classroom sinks and cabinets, installing a new air cooled chiller, new chilled water plant housed in a new concrete block structure, all necessary chilled water piping and extension of the existing hydronic heating water piping to the new UV's and existing air handlers, new dedicated domestic water heater
Project Details
George Whittell High School Stadium
Minden, Nevada
Status: Completed September 21, 2018
The stadium project includes improvements, removal and replacement of bleachers, installation of all-weather track and press box/concession stand and bathroom building.
Project Details
Vintage Senior Housing
Reno, Nevada
Status: Completed September 13, 2018
Demolition of the existing structures and new construction of a 4-story facility of approximately, 230,000 square foot senior living facility with 230 residential apartments and a connected clubhouse/activity center that also houses the administrative and operations offices. The apartments are a mix of 1 and 2 bedroom units.
Project Details
Marvin Picollo School
Reno, Nevada
Status: Completed October 15, 2018
Replace two (2) boilers and system pumps with two (2) boilers, two (2) boiler pumps and two (2) system pumps (with VFDs). A new roof-mounted exhaust fan will be added. New lighting and painting for the Boiler Room. An emergency eye wash with tempering valve and associated cold and hot water piping will be added. Scope of Work forClassroom Wing HVAC: Remove six (6) fan
Project Details
Wolf Run East Student Housing
Reno, Nevada
Status: Completed November 30, 2017
Wolf Run East Student Housing Project consists of seven 3 story buildings on 4.15 acres. Each building has 15 apartments. The apartment floor plans consist of twenty-one 3 bedroom units, sixty-three 2 bedroom units and twenty-one 1 bedroom units totaling 210 rental units. Some of the buildings have two ADA handicap accessible apartments located on the first floor.
Project Details
Bridges At Victorian Square
Sparks, Nevada
Status: Completed November 17, 2017
The key to this project was the Re-Design / Build Parking Structure where we save the owner over $1 million after our redesign and performed all of the forming and concrete work with our own in-house workforce.
Project Details
Gomes Elementary Mechanical Upgrade
Reno, Nevada
Status: Completed September 13, 2017
Scope of work is to demo and replace with new finishes after installation of new mechanical equipment.
Project Details
North Valley Signature Academy
Reno, Nevada
Status: Completed November 11, 2016
This project consisted of a remodel of existing space that housed the wood and metal industrial arts shops. We demolished the interior and installed new dust collectors, and installed all kinds of new tools including chop saws, lathes, routers, power saws, drill press. We revised the compressed air system, installed a large overhead crane requiring new footings
Project Details
Ely State Prison
Ely, Nevada
Status: Completed November 19, 2015
Remove and replace flooring in the infirmary and culinary areas of the prison.
Project Details
Reno Sparks Indian Colony
Reno, Nevada
Status: Completed December 04, 2014
This project involved re-modeling 4 separate buildings in a phased process which included extensive demolition, structural steel to completely change the support system for the roof structure, with interior buildout cresting numerous office, restroom, kitchen solar energy system, new plumbing, HVAC and flooring, ceramic tile, glass and glazing, ADA compliance, new roofing.
Project Details
C.O.D. Casino
Minden, Nevada
Status: Completed July 29, 2014
Converted a 100 year old brick building that was an automobile dealership into a casino. While making all the improvements to bring the building into today's code requirements, we maintained the historic exterior and much of the interior to preserve a pierce of history that has been a part of the Carson Valley for over 100 years.
Project Details
JOT Travis Lower Level Remodel
Reno, Nevada
Status: Completed May 09, 2012
We completed a remodel of approximately 13,000 sq ft of classroom space in 71 calendar days. The project consisted of extensive demolition; build out of 2 new restrooms, HVAC, electrical and the construction walls to create 8 new classrooms. This was particularly challenging due to limited access and working hours and very tight schedule of 71 calendar days.
Project Details
Sharland Terrace Apartments
Reno, Nevada
Status: Completed September 16, 2011
This project involved 152 apartments with numerous ADA problems including site, public and common areas, sidewalks and interior access to closets, bathrooms and kitchens. All of these areas had inadequate space to access sinks, toilets and no backing at the tub surrounds and at the toilets. We remodeled the entire complex without moving out a single tenant and minimum
Project Details
IVGID Recreation Crew Quarters
Incline Village, Nevada
Status: Completed December 31, 2008
Multi floor maintenance and crew ready facilities
Project Details
East Fork Fire Station #12
Carson City, Nevada
Status: Completed August 25, 2008
Emergency response facility with 24hr operation and volunteer operations wings.
Project Details
Wolf Run Village Student Housing
Reno, Nevada
Status: Completed September 11, 1997
Wolf Run Village is just two blocks from the University of Nevada, Reno (UNR) and only three blocks to the Student Union and Knowledge Center. We are just a short walk away from campus and we provide all our residents with gated, private parking.
Project Details
The Marlette
Carson City, Nevada
Status: In Progress
140-unit, garden-style, multifamily development. The complex is being developed on a 6.1-acre site. The community will feature 10 two-story buildings, each with 14 units, a 3,000 square-foot clubhouse, leasing office, fitness center, dog park, a playground, and a swimming pool area complete with cabanas, firepit seating, and an outdoor kitchen for resident use.
Project Details